![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
Just a quick note for my records:
I called Silver Lining today and my dress is scheduled to be delivered April 7th-14th. They'll call when it's delivered and I can make an appointment for the fitting. Need to find shoes before the fitting, if possible, so that the alterations to the length of the dress will match up with the height of the shoes.
I also told them that we've officially set a date- November 11, 2006, so they have that date written down instead of October, so they won't keep my dress if I don't pick it up in October!
I called Silver Lining today and my dress is scheduled to be delivered April 7th-14th. They'll call when it's delivered and I can make an appointment for the fitting. Need to find shoes before the fitting, if possible, so that the alterations to the length of the dress will match up with the height of the shoes.
I also told them that we've officially set a date- November 11, 2006, so they have that date written down instead of October, so they won't keep my dress if I don't pick it up in October!